Major track records 10 | EPC Project : Construction/Installation |
---|---|
Company / Contractor | KNOC/SK E&C |
Scope of work | Permanent Pipe Recovery and Installation Project (44” Crude pipeline Spool piece) |
-Replacement of Dummy PLEM Pipe to New PLEM Pipe(with 900lbs Flanges on) -Subsea Bolt tensioining -Lifting frames to maintain the level |
|
Period | 2017.06. ~ 2017.12. |